ITB-100 Thermal Battery - Complete Bill of Materials Cost Summary by Category CategorySubtotalNotesHeat Exchanger Assembly$1,456Plates, manifolds, thermal bondingStructural Components$389Spacer frames, fasteners, compression hardwarePhase Change Material System$687SAT, stabilizers, pouches, sealingNucleation & Control$145Electrodes, power supply, wiringPlumbing & Hydraulics$278Fittings, pump, insulationEnclosure$320Freezer, modifications, through-wall fittingsTools & Consumables$225One-time tooling, adhesives, safety equipmentTOTAL PROJECT COST$3,500Complete prototype system
DETAILED LINE ITEMS
- Heat Exchanger Assembly ($1,456) ItemSpecQtyUnit PriceTotalSupplier/SourceAluminum Plates6061-T6, 500×600×2mm, two 10mm holes52$18.00$936OnlineMetals.com, MetalsDepotSS316L Flexible Tubing3/4” OD (19.05mm), 0.889mm wall4m$12.50/m$50McMaster-Carr #8267K73Thermal EpoxyArctic Alumina, 400g kit (104 joints)2$35.00$70Amazon, NeweggTube Fittings3/4” NPT to barb adapter, SS3164$15.00$60McMaster-CarrTube Unions3/4” compression union, SS3162$22.00$44McMaster-CarrManifold Tees3/4” NPT tee for flow splitting4$18.00$72McMaster-CarrCleaning SuppliesAcetone (1L), degreaser, rags1$25.00$25Hardware storeCutting/DrillingMetal saw blades, drill bits (10mm)1$50.00$50Hardware storeDeburring ToolRotary deburring bit set1$18.00$18AmazonSafety EquipmentCut-resistant gloves, safety glasses1$25.00$25Hardware storeLeak TestingPressure gauge, test rig materials1$35.00$35Harbor FreightThermal Paste (temporary)For assembly alignment testing1$12.00$12AmazonAssembly Jig MaterialsPlywood, clamps for drilling jig1$60.00$60Hardware store Notes:
Aluminum plates: Consider getting quotes from local metal suppliers for bulk discount (52 plates) Alternative: Laser cutting service (SendCutSend.com) may be cheaper for precise hole placement (~$15/plate) Thermal epoxy: Arctic Alumina rated to 180°C, thermal conductivity 7.5 W/m·K SS316L tubing: Flexible/annealed type for easy bending, not rigid pipe
- Structural Components ($389) ItemSpecQtyUnit PriceTotalSupplier/SourceHDPE Sheet Stock12mm thick, 4’×8’ sheets (122×244cm)2$95.00$190USPlastic.com, Curbell PlasticsHDPE CuttingWater jet or CNC router service51 frames$2.50/frame$128Local fabrication shopThreaded RodsM10×600mm, zinc-plated steel4$8.00$32McMaster-Carr, hardware storeHex Nuts (M10)Zinc-plated, standard24$0.50$12Hardware store (bulk pack)Flat Washers (M10)Large OD (30mm), zinc-plated24$0.75$18Hardware storeCorner Angle BracketsL-brackets for stack stabilization8$3.50$28Hardware storeBottom Plate1/2” plywood base, 520×620mm1$25.00$25Hardware storeTop Compression Plate1/2” plywood, 520×620mm1$25.00$25Hardware store Notes:
HDPE sheets: Buy two 4’×8’ sheets, yields 51+ frames with minimal waste Alternative to water jet: Cut frames yourself with jigsaw + template (adds labor, reduces cost by ~$100) Threaded rods: 600mm length accounts for 416mm stack + 2× end plates + nut stacks Consider stainless steel rods for corrosion resistance in humid freezer environment (+$15 total)
- Phase Change Material System ($687) ItemSpecQtyUnit PriceTotalSupplier/SourceSodium Acetate TrihydrateTechnical grade, CH₃COONa·3H₂O227 kg$1.80/kg$409BulkReefSupply, Lab AlleyNa-PMAA StabilizerSodium poly(methacrylic acid), 35% solution2 kg$45.00/kg$90Lab chemical suppliersDisodium PhosphateNa₂HPO₄·2H₂O, dihydrate form5 kg$12.00/kg$60Lab Alley, ChemWorldPouch MaterialPET/Al/PE laminate, 150μm thick, 24” width40m$3.50/m$140PackagingSupplies.comImpulse Heat Sealer12” sealing width, adjustable temp1$65.00$65Amazon (Metronic, TECbuy)Mixing Vessel20-gallon HDPE drum with lid2$35.00$70USPlastic.comImmersion Heater1500W, thermostat control to 80°C1$45.00$45AmazonMixing PaddleHeavy-duty drill attachment1$25.00$25Hardware storeFunnel SetLarge bore (2” opening) for pouch filling1$18.00$18AmazonScaleDigital, 0-5kg capacity, 1g resolution1$30.00$30Amazon Notes:
SAT: Bulk pricing improves significantly above 200kg - contact suppliers for quotes Alternative SAT source: Recrystallized “hot hand” warmers (tedious, not recommended for 227kg) Na-PMAA: Critical for preventing phase separation - DO NOT SKIP Pouch material: WVTR <0.1 g/m²/day is mandatory (verify aluminum layer present) Sealing: Practice on water-filled pouches before using expensive SAT mixture Consider renting commercial heat sealer (~$50/week) for better seal quality
- Nucleation & Control System ($145) ItemSpecQtyUnit PriceTotalSupplier/SourceSilver Wire20 AWG (0.8mm), 99.9% pure10m$5.00/m$50Scientific wire suppliersInsulated Wire22 AWG, silicone jacket, rated 150°C50m$0.60/m$30Amazon, Digi-KeyDC Power Supply1.5V, 5A regulated bench supply1$35.00$35Amazon (adjust voltage via potentiometer)Push-Button SwitchSPST momentary, panel mount1$8.00$8Amazon, Digi-KeyConnectorsWaterproof wire connectors, 51 pairs1 pack$18.00$18Amazon (WAGO, lever-style)Project BoxABS enclosure for power supply/switch1$12.00$12Amazon, Digi-Key Notes:
Silver wire: Forms electrodes inside each pouch (2× 8cm strips per pouch) Each pouch needs electrode pair embedded during filling 1.5V DC is sufficient for nucleation - higher voltage unnecessary and dangerous Wire routing: Run through spacer frame channels to keep organized Consider adding current-limiting resistor (10Ω, 5W) for safety
- Plumbing & Hydraulics ($278) ItemSpecQtyUnit PriceTotalSupplier/SourceCirculator PumpGrundfos UPS15-58FC or equivalent, 3-speed1$125.00$125Amazon, SupplyHousePEX Tubing3/4” PEX-A, for external connections10m$2.50/m$25Hardware storePEX Fittings3/4” brass PEX fittings (various)10$6.00$60Hardware storeBall Valves3/4” brass, full port4$12.00$48Hardware storePipe Insulation3/4” foam tube insulation5m$3.00/m$15Hardware storeExpansion Tank2-gallon, pre-charged1$35.00$35Hardware storePressure Relief Valve30 PSI setting, 3/4” NPT1$18.00$18Hardware storeFill/Drain ValvesBoiler drain valve, 3/4”2$8.00$16Hardware storeGlycol (optional)Propylene glycol, food-grade (freeze protection)4L$15.00/L$60HVAC supplier Notes:
Pump: Size for ~5 GPM at 5 ft head (matches your 4.4 L/min calculated flow) PEX: Use PEX-A (expansion type) for better freeze resistance if using glycol Glycol: Optional if system is always heated, but provides insurance Expansion tank: Accommodates thermal expansion of water loop Pressure relief: Safety device - set below any component’s max rating
- Enclosure & Integration ($320) ItemSpecQtyUnit PriceTotalSupplier/SourceChest Freezer5.5 cu ft (160L), manual defrost1$220.00$220Home Depot, Walmart, CostcoBulkhead Fittings3/4” NPT, HDPE or PVC (thermal break)2$12.00$24McMaster-Carr, PlumbingSupplyPolyurethane FoamExpanding foam insulation, 2-part kit1$35.00$35Hardware storeSilicone SealantHigh-temp RTV silicone2 tubes$8.00$16Hardware storeFoam Board Insulation1” XPS rigid foam for top surface1 sheet$25.00$25Hardware store Notes:
Freezer: Look for sales - often $180-200 during holidays Manual defrost type preferred (no auto-defrost cycling that wastes energy) Bulkhead fitting installation: Drill 1” holes low on short side of freezer Seal bulkheads with polyurethane foam on exterior, silicone on interior Add extra top insulation to compensate for heat loss through lid
- Tools & Consumables ($225) ItemSpecQtyUnit PriceTotalSupplier/SourceDrill Press TimeRental or makerspace access for precise holes8 hrs$15.00/hr$120TechShop, makerspaceHeat LampsFor aluminum plate heating station (250W)4$12.00$48Hardware storeThermal Camera(Optional) For leak detection, borrowed1$0.00$0Borrow or rent (~$50/day)Teflon TapeThread sealant for NPT fittings3 rolls$3.00$9Hardware storeSandpaperVarious grits for deburring1 pack$12.00$12Hardware storeZip TiesCable management for wiring100 pack$8.00$8Hardware storeShop TowelsCleanup1 roll$12.00$12Hardware storeFirst Aid KitFor working with hot liquids, sharp metal1$25.00$25Pharmacy
COST OPTIMIZATION OPTIONS If $3,500 exceeds budget, consider these value-engineering options: ChangeSavingsImpact on PerformanceSelf-cut HDPE frames (no CNC)-$128None (just adds labor)Smaller capacity (26 plates instead of 52)-$95050% capacity reduction (8.4 kWh)Used chest freezer (Craigslist)-$120NoneSingle manifold instead of dual-$150~5% power reduction, uneven temp distributionSkip glycol (if no freeze risk)-$60Slight risk if heating failsDIY pouch material (mylar + heat seal)-$80Higher leak risk Realistic “budget build” target: $2,800 (with self-cut frames and used freezer)
PURCHASING STRATEGY Phase 1: Critical Path Items (Order First)
Aluminum plates (6-8 week lead time if custom cut) HDPE sheet stock SS316L tubing Chest freezer (check local availability)
Phase 2: Long-Lead Chemical Items
SAT (227 kg bulk order - negotiate shipping) Stabilizers (specialty chemicals, verify availability)
Phase 3: Standard Components
Fasteners, fittings, plumbing Tools and consumables Electrical components
Phase 4: Just-in-Time Items
Pouch material (after frame is complete) Thermal epoxy (use fresh for best performance)
TOTAL SUMMARY LineCostMaterials & Components$3,275Tool Rental/Access$120Contingency (10%)$105TOTAL PROJECT BUDGET$3,500 Cost per kWh of storage: $210/kWh (competitive with commercial thermal batteries at $250-400/kWh) Cost per kW of power: $1,740/kW (excellent for thermal systems)